May 16, 2025
Dug the hole and set the tank. Tied into the 3” w/ a 3-4 bell reducers and added a cleanout. Ran it into the tank and installed a baffle. Ran 100’ of sprinkler lines out to the east and put 2 sprinkler head spraying 180° back to back. Dug a trench for the electrical and had the electrician put conduit in the ditch. Filled the tank w/ water and backfilled.
Sand Springs,
February 10, 2025
Customer called us after receiving soil test results that they needed an aerobic system installed. Installed a new aerobic system with two sprinkler heads. DEQ installer licensed. All systems are DEQ certified.