Dalton joined Linn’s Plumbing 3 years ago and has been busy ever since,balancing his bachelor’s degree studies with hands-on plumbing experience. He’s currently working toward his Journeyman license and DEQ Certified Installer’s license. When he’s not working or studying, Dalton enjoys golfing and spending time with friends.

Customers love working with Dalton

See All

Jobs Completed by Dalton

See All

Stroud, OK

November 16, 2026

Installed the customer-supplied tub/shower trim kit and replaced the shower cartridge in the guest bathroom. Mounted the lavatory countertop and installed the customer-supplied bathroom faucet.

Installed the customer-supplied drop-in kitchen sink and faucet, along with the garbage disposal. Reworked the drain piping beneath the kitchen sink and installed a Studor air admittance valve for proper drainage.

Cleaned the screen in the master shower. Turned on the water and tested the completed fixture connections, with no leaks detected.

Chandler, OK

November 2, 2026

Installed a new 3/4” high-pressure gas line from the new gas meter to the existing underground gas yard line. Performed a pressure test on the yard line and the gas piping throughout the home in preparation for the city inspection.

The gas piping successfully passed the city inspection. Following approval, connected the home's gas line to the existing 1” regulator and tied it into the yard gas line.

Also installed a new 1” high-pressure gas line from the gas meter to the designated location for the future pool heater connection.

Tryon, OK

October 30, 2026

Ran a sewer camera through the existing sewer line to locate its path and identify the blockage. The camera was unable to advance past a point located in the alley.

Excavated the sewer line in the alley and discovered a large root ball growing around the connection where the sewer line ties into the city main, causing the blockage.

Removed the affected piping and replaced the sewer tap along with approximately 10 feet of sewer line in the alley. Completed all necessary connections and tested the new piping for leaks.

Verified there were no leaks at the time of testing. Backfilled the excavated area and cleaned up the job site upon completion.

Wellston, OK

July 15, 2026

Located and excavated the existing septic tank. Coordinated with Taylor’s to have the tank pumped out, then performed a full inspection. Determined the existing 1,000-gallon square septic tank is older but in excellent condition and suitable for continued use. Risers will be installed at a follow-up visit to provide easy access for future inspections and maintenance.

Excavated and installed a new header line and constructed a new lateral field consisting of four rows of chambers. All chamber rows were installed to proper grade and alignment to promote even wastewater distribution. Backfilled all excavated areas and graded the site upon completion. System is prepared for final riser installation and inspection.

Bristow, OK

March 25, 2026

Excavated and installed a 2” gray water line around the home, tying it into the main sewer line. Replaced the sewer line beginning approximately 8 feet beyond the concrete pad. Excavated across the driveway and installed a 4” sleeve for added protection, then transitioned from 3” to 4” piping beyond the sleeve. Excavated and prepared the tank area, set the tank, and ensured it was properly leveled using a transit. Installed the tight line and began chamber installation, completing two 60-foot rows based on site grade. Chambers were installed starting at 30” depth and ending at approximately 20”, then properly felted. Driveway was backfilled to allow homeowner access as needed; area is covered but will require final cleanup.

McLoud, OK

March 19, 2026

Installed and properly wrapped all chamber rows, maintaining a consistent depth of approximately 26–30 inches across 95% of the system. Performed initial grading to achieve proper elevation before installation, ensuring optimal depth without over-excavation. Completed two chamber rows distributed in four directions. Relocated and worked around an existing wood pile as needed, including additional grading to maintain consistent depth requirements.

Depew, OK

May 16, 2025

Dug the hole and set the tank. Tied into the 3” w/ a 3-4 bell reducers and added a cleanout. Ran it into the tank and installed a baffle. Ran 100’ of sprinkler lines out to the east and put 2 sprinkler head spraying 180° back to back. Dug a trench for the electrical and had the electrician put conduit in the ditch. Filled the tank w/ water and backfilled.

Sand Springs,

February 10, 2025

Customer called us after receiving soil test results that they needed an aerobic system installed. Installed a new aerobic system with two sprinkler heads. DEQ installer licensed. All systems are DEQ certified.