Job completed for Linda Bigsoldier
Completion date: October 30, 2026
Location: Tryon, OK
Solutions provided:
Ran a sewer camera through the existing sewer line to locate its path and identify the blockage. The camera was unable to advance past a point located in the alley.
Excavated the sewer line in the alley and discovered a large root ball growing around the connection where the sewer line ties into the city main, causing the blockage.
Removed the affected piping and replaced the sewer tap along with approximately 10 feet of sewer line in the alley. Completed all necessary connections and tested the new piping for leaks.
Verified there were no leaks at the time of testing. Backfilled the excavated area and cleaned up the job site upon completion.
Team members on this project:
Dalton