Job completed for Margaret K.
Completion date: March 25, 2026
Location: Bristow, OK
Why did the customer contact us?
Solutions provided:
Excavated and installed a 2” gray water line around the home, tying it into the main sewer line. Replaced the sewer line beginning approximately 8 feet beyond the concrete pad. Excavated across the driveway and installed a 4” sleeve for added protection, then transitioned from 3” to 4” piping beyond the sleeve. Excavated and prepared the tank area, set the tank, and ensured it was properly leveled using a transit. Installed the tight line and began chamber installation, completing two 60-foot rows based on site grade. Chambers were installed starting at 30” depth and ending at approximately 20”, then properly felted. Driveway was backfilled to allow homeowner access as needed; area is covered but will require final cleanup.
Team members on this project:
Drew, Dalton