Job completed for Orr Construction
Completion date: November 16, 2026
Location: Stroud, OK
Solutions provided:
Installed the customer-supplied tub/shower trim kit and replaced the shower cartridge in the guest bathroom. Mounted the lavatory countertop and installed the customer-supplied bathroom faucet.
Installed the customer-supplied drop-in kitchen sink and faucet, along with the garbage disposal. Reworked the drain piping beneath the kitchen sink and installed a Studor air admittance valve for proper drainage.
Cleaned the screen in the master shower. Turned on the water and tested the completed fixture connections, with no leaks detected.
Team members on this project: