Drew-profile

Drew

Service Technician

Date of Birth: November 13th

Hobbies: Fishing, hanging out with friends, and pickle ball

Drew

Service Technician

About Drew:


I have been plumbing for 3 years now, came to Linn's after high school and never knew what was possible. I now wake up every morning in search to better myself and help someone daily.

Customers love working with Drew

See All

Jobs Completed by Drew

See All

McLoud, OK

May 21, 2025

Dug the hole for the aerobic tank. Set the tank 10’ from the house and ran sprinkler lines out 50’ to the west and set the first head. Set the second head 60’ from the first to the south. Both heads spray 360° w/ 30’ spray radius. Tied in the sewer and added a cleanout. Stubbed up a 90 for the future plumbing to be tied into. Ran the electrical over from the house and tied it in. Backfilled and tested.

Depew, OK

May 16, 2025

Dug the hole and set the tank. Tied into the 3” w/ a 3-4 bell reducers and added a cleanout. Ran it into the tank and installed a baffle. Ran 100’ of sprinkler lines out to the east and put 2 sprinkler head spraying 180° back to back. Dug a trench for the electrical and had the electrician put conduit in the ditch. Filled the tank w/ water and backfilled.

Eufaula, OK

May 15, 2025

Dug and leveled the aerobic tank hole. Pumped out the existing septic tank and reused it as an extra trash tank. Set the aerobic tank and tied it into the septic tank. Ran 70’ of sprinkler lines setting 2 sprinkler heads back to back spraying 180°. Ran wire from the disconnect to the control box. Filled the tank with water and tested all is working.

Meeker, OK

May 5, 2025

Installed aerobic system. Dug and set tank, leveled it. Installed 4” sewer line drop with cleanout and plug for RV. Installed power line from control box to shop and wired in. Installed 60’ of sprinkler line 2 heads. Installed water line from well head to shop with bury hydrant. Installed t post with hydrant and zip tied it. Tied onto water line and added valve with valve box. Covered everything up and backfilled driveway, smoothed gravel back out. Casey did the tie on at the well and hand dug that part inside of the fence.

Beggs, OK

April 18, 2025

Installed sewer line with clean out, Installed Aerobic tank with sprinkler lines. Installed electrical wiring and tied into control box and disconnect. Set timer, tested system. Everything works. Raised control box and air compressor. Added 12” risers on the system.

Checotah, OK

April 16, 2025

Installed aerobic system. Tied into the 3” pvc coming out of the house and installed a cleanout. Ran 30’ of 4” to the tank. Connect the electrical to the disconnect on the house. Ran sprinkler line setting a sprinkler head at 60’ and 120’ spraying 360°. Backfilled around the tank and filled with water. Tested and gave the customers the warranty information.

Sapulpa, OK

April 16, 2025

Set and leveled tank. Installed sewer line. Ran 160’ of sprinkler line with 3 heads 35’ spray 80’ apart. With drains and pads. Raised control box, air compressor and tied air line back in. Installed 12” risers. Installed baffle on sewer line.

Cushing, OK

February 27, 2025

Pumped out, crushed and disposed of 1,000-gallon septic tank. Installed new 1,000-gallon tank with 250' of chambers for a new functioning septic system.

Sand Springs,

February 10, 2025

Customer called us after receiving soil test results that they needed an aerobic system installed. Installed a new aerobic system with two sprinkler heads. DEQ installer licensed. All systems are DEQ certified.

Haskell, OK

January 29, 2025

Customer called us after receiving soil test results that they needed an aerobic system installed. Installed a new aerobic system with two sprinkler heads. DEQ installer licensed. All systems are DEQ certified.

Weleetka, OK

January 28, 2025

Customer called us after receiving soil test results that they needed an new septic tank and chambers installed. Installed a new 1,000-gallon septic tank with 500' chambers. DEQ installer licensed. All systems are DEQ certified.

Edmond, OK

June 21, 2023

Completed phase of top out plumbing for a new home that was under construction.