Job completed for Lauren R.
Completion date: April 16, 2025
Location: Sapulpa, OK
Solutions provided:
Set and leveled tank. Installed sewer line. Ran 160’ of sprinkler line with 3 heads 35’ spray 80’ apart. With drains and pads. Raised control box, air compressor and tied air line back in. Installed 12” risers. Installed baffle on sewer line.
Team members on this project:
Drew