Job completed for Denna S.

Completion date: May 5, 2025

Location: Meeker, OK

Solutions provided:

Installed aerobic system. Dug and set tank, leveled it. Installed 4” sewer line drop with cleanout and plug for RV. Installed power line from control box to shop and wired in.
Installed 60’ of sprinkler line 2 heads.
Installed water line from well head to shop with bury hydrant. Installed t post with hydrant and zip tied it. Tied onto water line and added valve with valve box. Covered everything up and backfilled driveway, smoothed gravel back out.
Casey did the tie on at the well and hand dug that part inside of the fence.

Team members on this project:

Drew

Photos & Videos:

Water line installed
Large View Icon
Water line installed
New Bury Hydrant
Large View Icon
New Bury Hydrant
Aerobic Tank Hole
Large View Icon
Aerobic Tank Hole
Aerobic Tank
Large View Icon
Aerobic Tank
Aerobic Tank Installed
Large View Icon
Aerobic Tank Installed