Job completed for Charles F.

Completion date: July 29, 2026

Location: Chandler, OK

Solutions provided:

Taylor’s pumped the existing septic tank. After pumping, technicians inspected the tank and determined it to be in good condition and suitable for continued use. Installed new risers and lids, then properly sealed and secured them to provide access for future inspection and maintenance. Excavated the tank outlet and installed approximately 120 feet of new tight line. Installed a new lateral field consisting of three rows of chambers: 24 chambers in the first row, 30 chambers in the second row, and 9 chambers in the third row. Installed filter fabric over the chambers and properly covered the field. Sealed the septic tank outlet and completed all necessary connections. Upon completion, backfilled all trenches and excavated areas and cleaned up the job site.

Team members on this project:

Drew

Photos & Videos:

backfilled
Large View Icon
backfilled
Chambers
Large View Icon
Chambers
Septic tank outlet
Large View Icon
Septic tank outlet
Sewer line from septic to chambers
Large View Icon
Sewer line from septic to chambers