Job completed for Desiree P.
Completion date: December 1, 2025
Location: Kendrick, OK
Solutions provided:
Cut and removed existing concrete to access gas line. Replaced approximately 4 feet of 3/4” poly gas pipe and installed a new 3/4” gas riser. Pressure tested the repaired section at 20 PSI for 30 minutes to ensure system integrity. No leaks were detected and everything is operating properly at this time.
Team members on this project:
Robert

