Job completed for Jordan H.

Completion date: September 18, 2025

Location: Beggs, OK

Why did the customer contact us?


Solutions provided:

Dug hole and leveled it. Set tank and leveled it. Installed sewer line with clean out and baffle. Installed power from disconnect to control box. Installed 120’ of sprinkler line with 2 heads 30’ 360° spray with drains and pads.

Swapped float wires, greased control bar. Disconnect is on, breakers in control box off. System needs water. Went over warranty info.

Cleaned up and backfilled.

Team members on this project:

Drew

Photos & Videos:

Aerobic Tank Backfilled
Large View Icon
Aerobic Tank Backfilled
Sprinkler head
Large View Icon
Sprinkler head
Aerobic Tank
Large View Icon
Aerobic Tank