Job completed for Rick R.
Completion date: May 12, 2025
Location: Stroud, OK
Solutions provided:
Installed whole house sediment filter, Novo water softener, replaced 5-1/2” shut off valves, replaced both boiler drains at washer box, replaced tub and shower valve and installed 2-1/2” pex ball valves. Installed new frost free hydrant.
Team members on this project:
Robert